Red Bud South
Red Bud South
This project will upgrade the existing two-lane roadway to a five-lane, divided arterial roadway with a continuous left-turn lane.
This virtual open house is designed to give you information about the upcoming project to upgrade Red Bud Lane between Evergreen Drive and Gattis School Road from the existing two-lane roadway to a new five-lane divided road. Design should be completed in 2021 with construction to begin in 2023. Please click through the pages shown above to give us your input and learn more about the existing conditions and proposed design.
More information is also available on our project website: www.roundrocktexas.gov/transportprojects/red-bud-lane-south-evergreen-drive-to-gattis-school-road/
Contact us
Have more comments or questions? Contact Project Manager Dawn Scheel at 512-218-6603 or dscheel@roundrocktexas.gov.