W-5710AK - Intersection improvements along N.C. 16 - Charlotte
W-5710AK - Intersection improvements along N.C. 16 - Charlotte
Proposed intersection improvements at the intersections of N.C. 16 (Brookshire Boulevard) with Old Plank Road and Pleasant Grove Road in Mecklenburg County.
Vicinity Map:
Project Overview
The N.C. Department of Transportation proposes to construct reduced conflict intersections (RCIs) at the intersections of N.C. 16 (Brookshire Boulevard) with Old Plank Road and Pleasant Grove Road in Charlotte.
Improvements proposed include converting the traditional intersections to RCIs to help reduce crashes occurring at these two intersections.
What is a Reduced Conflict Intersection?
The most common type of reduced conflict intersection design eliminates left turns from side roads onto busy main roads.
Raised medians direct traffic from the side road to turn right. When there is a safe opening in traffic, drivers enter the flow of traffic on the main route. To go the other direction (traditionally a left turn), or cross the highway, drivers pull into a dedicated lane – typically less than 1,000 feet away – and make a U-turn. There may be a traffic signal at this location.
View or download project map for N.C. 16 and Old Plank Road click here or click on the picture below.
View or download project map for N.C. 16 and Pleasent Grove Road click here or on the picture below.
A diagram of Reduced Conflict Intersection traffic patterns
Watch this short video to get more information on Reduced Conflict Intersections:
Public Involvement
The public is encouraged to review the information presented and provide comments or questions regarding the proposed improvements.
Comments may be submitted below, via email to NC16-Charlotte@PublicInput.com or by phone (512-580-8850 and enter project code 8524).
Comments should be submitted by September 20, 2022.
Project Funding:
Activity | Estimated Costs* |
Project Development & Design | $ 210,000 |
Construction Cost | $ 1,950,000 |
Total Cost | $ 2,160,000 |
*Estimated costs are subject to change. Based on currently adopted NCDOT State Transportation Improvement Program.
Project Timeline:
Milestone | Date* |
Public Outreach | August 2022 |
Construction Begins | July 2022 |
* Future dates subject to change.
Comments:
NCDOT accepts comments throughout all planning, design and construction phases of project development.
All comments will be taken into consideration, and carry equal weight, regardless of submittal method.
To submit comments for consideration during the current phase of project development, please submit before September, 16, 2022.
You may leave a comment or question below
Or
Email the comment or question to NC16-Charlotte@PublicInput.com
Or
Phone Number: (512) 580-8850 Code: 8524
PROJECT CONTACT INFORMATION
Donald Harward
Division Project Engineer
NCDOT Highway Division 10
716 W. Main St.
Albermarle, NC 28001
PROJECT CONTACT INFORMATION
Jared Mathis
Senior Division Design Construction Engineer
NCDOT Highway Division 10
716 W. Main St.
Albermarle, NC 28001
Title VI Feedback
To ensure we’re hearing from a broad set of voices, would you be willing to share (completely anonymously) some information about yourself?
If so, please click here https://publicinput.com/NCDOT-Title-VI