Construction Update | May 2, 2024 ADJACENT PROJECT US-89 Weekend Closure – Drivers from NB US-89 will be detoured to I-15: In partnership with the Weber Basin Water District, UDOT crews will continue installing a new waterline from Friday, May 3, at 8 p.m. through Monday, May 6, at approximately 1 p.m.
Drivers can expect heavy traffic and long delays. To learn more about this project, contact UDOT Region One at 801-620-1600.
There will be no UDOT 5600 South traffic restrictions in the project area while the US-89 work takes place. On-ramp to I-15 NB and Riverdale Rd. is shifting south toward 5600 South.
Exit 338: I-15 NB to 5600 S. / Riverdale Rd Exit is shifting south to the newly constructed ramp location next week. Work on and around the ramp will continue. Drivers can expect minimal delays.
Along 5600 South (SR–97) Third–party utility work is taking place along 5600 South (SR–97) on the north and south sides in park strips at intermittent locations. Some properties along the corridor may be in a Public Utility Easement (PUE). This easement ensures that vital services, such as power lines, water pipes, gas lines and communication cables can be accessed and maintained efficiently.
Restoration work will be happening as utility work progresses through early summer. Please contact the project team if you have any questions.
Aerial view of 5600 South (SR-97) at 3100 W facing northeast. Ongoing Work I-15 NB CD Structure at 5600 South (SR-97) Crews will continue wall construction work that includes backfilling, forming the approach slabs along with finishing completing pouring activities on the deck of the Collector Distributor (CD) Bridge. Freeway Park Dr. A section of the southbound lane along Freeway Park Dr. will remain closed intermittently through Tuesday, May 14* to accommodate a waterline and utility work. Business access will be maintained. Drivers will not be able to access 5600 South westbound, use alternate routes.
5600 South (SR-97) Utility and drainage work along the south side of 5600 South will continue intermittently throughout the corridor.
Along 5600 South, crews will continue setting retaining panels around the UPRR (Union Pacific Railroad) bridge and along the north side at 2300 W for the next few weeks. Drivers can expect lane shifts, one-way flagging operations, adjacent cross street closures, and short-term delays along the corridor. Did you hear about the 5600 South project in the news? UDOT and the project team collaborated with community partners and celebrated National Work Zone Awareness Week at Roy Elementary by hosting a safety assembly and activities for K–6th grade and made sure to "Go Orange" on April 17. Go Orange Day is especially important to the families of victims who have lost their lives in the work zones.
As young individuals, it is important to understand the potential hazards in construction work zones and how to stay safe. Some work zone safety tips that were shared with the students:
By taking these precautions, students walking near work zones can ensure a safe and enjoyable experience during road construction. You can view the local story published here.
Learn more about National Work Zone Awareness Week by visiting nwzaw.org. Roy Elementary Safety Assembly on April 17.
Roy Elementary "What Safety Means to Me" student artworks.
I-15 Collector Distributor (CD) Structure at 5600 South (SR-97) Timelapse video of crews completing and setting CD structure girders (beams) in February.
Pedestrian Safe Walking Routes Update Crews have implemented an addition to the safe walking route from 2700 W to 2425 W, along 5600 South to accommodate bridge reconstruction on the north side of the UPRR bridge. Demolitions has began, please plan accordingly. This addition to the route will be in place through Fall 2024.
Drivers: Slow down and be aware of the suggested safe walking routes along 5600 South. Be alert and watch for students traveling along the corridor.
For everyone's safety, please do not enter the work areas and stay away from equipment.
Know Before You Go! Download the UDOT Traffic App Today!
Ongoing Corridor Activities Daytime, nighttime, and occasional weekend work will be taking place throughout the project. Right-of-Way Acquisition and Demolition Demolition work on UDOT acquired properties along 5600 South will continue. This work will take place during daytime hours. Surrounding areas can expect noise, dust, vibration, heavy equipment, and workers at each location. Short-term shoulder closures may be implemented to assist demolition equipment entering and exiting the area. *Properties awaiting demolition are secured and routinely monitored for safety and security purposes. Trespassing will be prosecuted. Right-of-way acquisition with affected properties along 5600 South is ongoing. If you suspect that your property may be impacted:
CD bridge over 5600 South (SR-97) at I-15 facing northeast. | ||||||
Contact Us
Join our mailing list! Email us at 5600south@utah.gov to receive updates about the project.
The project team is here to help. Please call or email with any questions or comments.
Hotline: 385-383-6576
Email: 5600south@utah.gov
*Construction schedules are subject to change due to weather, utility, material and equipment delays.
Project impacts to travel can be found on the UDOT Traffic Website, www.udot.utah.gov/traffic or by downloading the UDOT Traffic app.