What is the Project?

This project will widen and resurface South Gilmore Road between Flaig Drive and Resor Road to provide two travel lanes in each direction, and a center median/turn lane. The roadway will be widened through the intersection with Resor Road to eliminate the existing southbound merge that occurs to the north. The existing traffic signal infrastructure will be upgraded at the intersection, and signal timing will be optimized. New sidewalks will be provided with the project; these will be from Flaig Drive to Planet Drive on the west and from Mack Road to Resor Road on the east. Minor utility relocations will be required to accommodate the proposed improvements. Temporary easements are anticipated from approximately 17 parcels and permanent right-of-way is anticipated from approximately 2 parcels.