Federal Highway Administration (FHWA)

The Waterfront Park is a public facility under the Town of Calabash jurisdiction within the study area of the BR-0160 project. For Federally-funded projects such as BR-0160, public parks and recreation facilities are afforded special protection under Section 4(f) of the USDOT Act (recodified in 49 U.S.C. § 303 and 23 U.S.C. § 138), and Section 6009(a) of SAFETEA-LU (23 CFR 774). Provisions in SAFETEA-LU allow that if a proposed transportation project is determined to not “adversely affect the activities, features, and attributes” of the resource protected under Section 4(f), then a de minimis finding can be made by FHWA to satisfy the requirements of Section 4(f), which is their intent for this project.

The project’s effect on Town of Calabash land and the Waterfront Park are based on preliminary engineering design (plan sheets attached). Preliminary designs indicate that NCDOT would require approximately 0.210 acres of right-of-way (ROW), 0.026 acres of public utility easement, and 0.092 acres of temporary construction easement (TCE).  Although the project will require the use of land from the Town, access will be maintained to the Waterfront Park for users once construction is completed. In addition, the project will provide will a 10’ wide multi-use path along the west side of NC 179B (Beach Drive SW) that will connect to the Waterfront Park and provide additional access.

 

Download PDF of the 4(f) Property Impact Map

Project Comments

Comments on the proposed de minimus determination can be submitted below or through the project email or phone number by Dec. 15.

 

Email: [email protected]

Phone Number: 984-205-6615 enter project code 5446

 

Question title

Do you have any comments or questions regarding the de minimis determination by the Federal Highway Administration?

Project Design

The proposed bridge will: 

  • Be approximately 576 feet long 

  • Provide two 12-foot lanes, one lane in each direction

  • Include a 4-foot paved shoulder on the northbound side of the roadway

  • Include a 10-foot wide multi-use path along the southbound side of the roadway, separated from the road by a 42 inch vertical concrete barrier

 

Detour Route

​Construction is expected to have a minimal impact on the surrounding environment and will require an off-site detour during the 18 months of construction.​

Project Funding

 

Cost*

Project Development & Design

$1,710,000

Construction

$7,000,000

Total

$8,710,000

* Costs are preliminary and subject to change

Project Timeline

Milestone

Date*

Project Newsletter

November 2021

Environmental Document 

December 2021

Right-of -Way

January 2022

Construction

Fall 2023

* Future dates are preliminary and subject to change

Question title

Would you like to be added to the project mailing list?

Project Contact

 Derek Pielech, PE

NCDOT Division 3

5501 Barbados Boulevard

Castle Hayne, NC 28429

 

[email protected]

984-205-6615  code 5446

 

Resources For Property Owners

Although the NCDOT works to minimize the number of homes and businesses displaced by a road project, it is inevitable, in many cases, that a certain amount of private property is needed. The following information explains right-of-way acquisition and answers questions about the process.  

 

Relocation Assistance Brochure                           Asistencia para Reubicación      
Right-of-Way Acquisition Process Brochure       Folleto del Proceso de Adquisición de Bienes Raíces
Right-of-Way Frequently Asked Questions