BP3.R012: Bridge No. 208 on Village Road NE over Sturgeon Creek in Brunswick County
BP3.R012: Bridge No. 208 on Village Road NE over Sturgeon Creek in Brunswick County
NCDOT is proposing to replace Bridge No. 208 on Village Road NE over Sturgeon Creek in Brunswick County.
Project Study Area Map
This map is for reference only and is a representation of the general project area.
Project Highlights
The purpose of this project is to replace Bridge No. 208 on Village Road NE over Sturgeon Creek. The current bridge is 101 feet long with a roadway width of 33.8 feet. The replacement structure would be a 24-inch cored slab bridge approximately 130 feet long providing a 45-foot clear deck width. The bridge will include two 12-foot lanes, 3- to 4-foot shoulders, a 10-foot 9-inch multi-use path (MUP), separated from travel lanes by a one-foot wide concrete divider, and a two-bar metal barrier rail. The roadway grade of the new structure will be approximately the same as the existing structure.
An off-site detour will be used to maintain traffic during construction. The off-site detour is approximately 5 miles in length and uses Old Fayetteville Road, Lanvale Road, and Village Road. A traffic signal will be installed at the intersection of Lanvale Road and Village Road/Fletcher Road to help with the off-site detour. The traffic signal will remain in place after completion.
Proposed Typical Section
Project Funding
| Estimated Amount* |
Property Acquisition | $ 150,000 |
Utility Cost | TBD |
Construction Costs | $ 2,500,000 |
Total Cost | $ 2,650,000+ |
* Estimated costs are preliminary and subject to change
Project Timeline
Milestone | Date* |
Public Engagement | January 2023 |
Complete Environmental Documentation | March 2023 |
Begin Right of Way Acquisition | March 2024 |
Begin Construction | July 2027 |
* Future dates are preliminary and subject to change
Project Comments
NCDOT accepts comments throughout all phases of project development.
All comments will be taken into consideration, and carry equal weight, regardless of submittal method.
Comments for consideration during the current phase of project development were submitted by February 6, 2023.
Project Contact
Derek Pielech, PE
NCDOT Highway Division 3
Division Bridge Program Manager
5501 Barbados Boulevard
Castle Hayne, NC 28429-5647
Project Contact
Elizabeth Workman
Three Oaks Engineering
Consultant Project Manager
1730 Varsity Drive #140
Raleigh, NC 27606
Title VI Feedback
To ensure we’re hearing from a broad set of voices, would you be willing to share (completely anonymously) some information about yourself?
If so, please click here: https://publicinput.com/NCDOT-Title-VI
RESOURCES FOR PROPERTY OWNERS
Although the N.C. Department of Transportation works to minimize the number of homes and businesses displaced by a road project, it is inevitable, in many cases, that a certain amount of private property is needed. The following information explains right of way acquisition and answers questions about the process.
Right-of-Way Brochure Single Page Layout Folleto del Proceso de Adquisición de Bienes Raíces
Right-of-Way Frequently Asked Questions
Right of way Acquisition Process Videos