Apollo Beach Boulevard Corridor Safety Improvements
Apollo Beach Boulevard Corridor Safety Improvements
This virtual public engagement will be open from Nov. 16, 2026 - Dec. 7, 2026.
About the Project
The Apollo Beach Boulevard Corridor Safety Improvements Project Development Study is evaluating potential improvements to enhance safety, mobility, and operations along the corridor.
Proposed improvements being considered include:
Reconfiguring turn lanes at the U.S. 41 intersection
Evaluating alternative intersection designs at the Fairway Boulevard/Manila Palm Way intersection
Adding new crosswalks
Filling gaps in existing sidewalks
Constructing a shared-use path
Enhancing bicycle accommodations
Adding parallel parking near Surfside Boulevard
Modifying median openings
Improving access management
Milling and resurfacing the entire corridor
The proposed improvements are intended to address issues most important to the community, such as safety, congestion, pedestrian and bicycle accommodations, and overall travel efficiency along the corridor.
The project limits are outlined below:
Quick Facts
(CIP #69682023)
Location: Apollo Beach, District 4
Project Type: Roadway Corridor Improvements
Current Project Phase: Project Development