Detroit Street Reconstruction Project in Kenton
Detroit Street Reconstruction Project in Kenton
U.S. Route 68, from Carrol Street to Eliza Street (PID 115774)
The city of Kenton, in partnership with the Ohio Department of Transportation (ODOT), is proposing a project that will address deteriorating pavement conditions, improve drainage, and enhance pedestrian accessibility along U.S. 68 (Detroit Street) from Carrol Street to just north of Eliza Street.
Specific roadway and drainage improvements proposed along this section of Detroit Street include:
- Reconstruct pavement
- Replace curbs and gutters
- Replace stormwater drainage and waterlines
Proposed pedestrian enhancements include:
- Replace deteriorating sidewalks along both sides of the roadway
- Install ADA-compliant curb ramps at intersections
The City expects that trees within the street lawn will need to be removed to facilitate the sidewalk replacement. The City plans to work with ODNR (Ohio Department of Natural Resources) and the Tree Commission to replant trees along the corridor.
Temporary right-of-way will be needed to perform the sidewalk and curb ramp upgrades. Construction is anticipated to begin in spring of 2025.
Why are we conducting a virtual public open house?
The city of Kenton, in cooperation with ODOT, is hosting a virtual public open house for this project, to present project information, including the potential impacts, and receive your input. This online presentation is being used to allow us to continue the important responsibility of engaging with the public about transportation projects. We encourage and welcome your comments and questions.
Virtual Open House
April 4 – May 4, 2023
Please review the tabs and documents provided on this website, then provide your comments on the Comment Form tab.
Your comments are always welcome, but must be received by May 4, 2023, to be considered during this phase of project development. We offer multiple options for submitting comments:
- Click on the Comment Form tab to enter your comments on this website
- Download the "Comment Form" on the side bar along the right side of this page and submit it per the instructions on the form
- Contact Cindy Murray at (419) 674-4850 or safetyservice@cityofkenton.com to share your comments
Public participation is solicited without regard to race, color, sex, age, national origin, or disability.
Internet Access Difficulties
A transcript of the video and a printout of exhibits will be provided to any individual having issues accessing the virtual public open house. Please send a request using one of the following contact methods:
City of Kenton
Attention: Cindy Murray
111 E. Franklin Street
Kenton, Ohio 43326
Telephone Number: (419) 674-4850
E-mail: safetyservice@cityofkenton.com
ODOT has assumed the Federal Highway Administration’s responsibilities under the National Environmental Policy Act (NEPA). The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by ODOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding signed December 14, 2020, and executed by FHWA and ODOT.
For more information, download the NEPA Assignment Brochure in the Document Section to the right, or visit ODOT's NEPA Assignment website.