Route 23 Weber City Project Pipeline Study/Citizens Information Meeting

Route 23 Weber City Project Pipeline Study/Citizens Information Meeting

Welcome to the online information meeting for the VDOT Project Pipeline study for Route 23 Weber City (Scott County). An in-person meeting is scheduled for Wednesday, May 25 from 5 - 7 p.m. at Scott County Vocational Center (387 Broadwater Avenue in Gate City). Should there be inclement weather or extenuating circumstances arise, the meeting will be rescheduled for May 31 at the same time and location. 

View all Route 23 study materials here.
 

Benefits

The purpose of this study is to analyze the operational and safety issues identified along U.S. Route 23 between the Tennessee state line and the U.S. Route 58 intersection in Scott County. This corridor has a high number of crashes attributed to poor spacing between the intersections and various site access driveways located along the corridor, which impacts the reliability of the US 23 corridor. The objective of this study is to identify cost-effective preferred improvement alternatives that address the deficient conditions and minimize right of way impacts.
 

Public Outreach

An in-person citizen information meeting is scheduled for this study:

  • Wednesday, May 25 from 5 - 7 p.m. at Scott County Vocational Center (387 Broadwater Avenue in Gate City). Should there be inclement weather or extenuating circumstances arise, the meeting will be rescheduled for May 31 at the same time and location. 

The comment period for the study closes June 4, 2022.


Information Meeting Materials 

Resources
Contact Information: 
Blake Ailor, VDOT Bristol District Planner
Blake.Ailor@vdot.virginia.gov
276-696-3420

Phase: study phase

Locality: Weber City/ Scott County/ VDOT Bristol District

Translation assistance: For translation assistance, please call the VDOT Bristol District Office at (276) 696-3244. More information on Translation services can be acccessed here.

Provide Project Feedback

Contact Information

(required) Contact Information (optional):

What specific issues/concerns do you have about the study corridor? Check all that apply:

Congestion/Operations
86%
Road Condition
57%
Safety/Crashes
57%
Speed Limit/Travel Speeds
43%
Heavy Vehicle Traffic
43%
Future Growth/Economic Development
43%
Transit Service Coverage
29%
Bicycle/Pedestrian Accommodations
29%
Closed to responses | 7 Responses

Are you in favor of this project and the recommendations shown in the summary document?

No
60%
Yes
20%
Other
20%
Closed to responses | 5 Responses

Do you have any major concerns regarding the study recommendations?

Safety
100%
Timeline
25%
Other
25%
Cost
0%
Environment
0%
Right of Way
0%
Closed to responses | 4 Responses

Would these modifications improve your daily travel or make conditions safer along the corridor?

No
60%
Yes
40%
Other
0%
Closed to responses | 5 Responses

In terms of acquisition of right of way to address potential issues along the study corridor, please choose one of the following responses:

No opinion/more information needed to respond
50%
Yes, things need to be fixed
25%
No, I do not support right of way acquisitions
25%
Minimal right of way acquisitions are acceptable
0%
Closed to responses | 4 Responses

Please provide additional comments regarding the study here.

Closed for Comments

How did you hear about this meeting?

Social media
75%
Newspaper
50%
Direct mail
25%
Other
25%
Road sign
0%
Project website
0%
Closed to responses | 4 Responses