Benefits

The Millwood Avenue project will enhance safety and traffic flow through the corridor. The Millwood Pike – Millwood Avenue projects are designed to accommodate the planned widening of Interstate 81 through the Winchester area, and future improvements along the Millwood corridor

Public Outreach

The Virginia Department of Transportation and the City of Winchester are proposing improvements along Millwood Avenue in Winchester. The proposed improvements include two left-turn lanes for westbound Millwood drivers turning onto Apple Blossom Drive. Also starting at this intersection, eastbound drivers will have a third lane extending all the way to the I-81 southbound ramp.

The nearby intersection of Millwood and Mall Boulevard will be reconstructed to eliminate the crossover, including removing the traffic signal and installing a full grass median. This intersection will allow right turns only, which will improve traffic flow for through traffic on Millwood.

To improve pedestrian access and safety, a new signalized pedestrian crossing next to Abrams Creek will connect the main campus of Shenandoah University with the South Campus Commons.

This project is adjacent to the VDOT I-81 bridge project at the intersection of Millwood Avenue and Mall Boulevard. In fact, VDOT is expanding its Millwood Pike bridge project in Frederick County to tie-in and incorporate these improvements located west of the bridge in the City. This work will proceed forward as one project, which will enhance safety and traffic flow through this busy corridor.

Pedestrian traffic will be prohibited in the work zone during construction, which is scheduled to begin in spring 2025 and take about two-and-a-half years to complete. VDOT plans to minimize the impact on vehicle traffic by constructing the new bridge and its roadway approaches to the north of the existing ones. Occasional single-lane closures may be needed for the movement of materials and equipment and during final transition to the new bridge.

In 2019 Millwood Avenue had an average daily traffic count of 32,000 vehicles per day.  By the design year of 2045 the estimated average daily traffic volume is 61,200 vehicles per day.

The total estimated cost for the Millwood Avenue project is $6,498,892, including $749,684 for preliminary engineering, $1,598,511 for right of way and $4,150,697 for construction.

The total cost of the Millwood Pike and Millwood Avenue combined project is estimated at 45 million dollars. This includes preliminary engineering, right-of-way acquisition and construction. The Millwood Pike – Millwood Avenue projects are designed to accommodate the planned widening of Interstate 81 through the Winchester area, and future improvements along the Millwood corridor.

Project Schedule (Millwood Avenue)
Consideration for Design Approval - Spring 2023
Begin Acquisition of Right of Way - Early 2024
Construction - Winter/Spring 2025

Project Costs (Millwood Avenue)
Preliminary Engineering  $749,684
Right of Way  $1,598,511
Construction  $4,150,697
Estimated Total Cost  $6,498,892

Public Meeting 
Design Public Hearing (with break in limited access)
January 24, 2023, 4-6 p.m.
Inclement weather date: Tuesday, January 31, 2023

Public Meeting Location
Rouss City Hall
15 North Cameron Street
Winchester, VA 22601

 

Design Public Hearing Materials 

 

Resources
Contact Information: 

David Robinson, P.E.
540-332-7758
david.robinson@vdot.virginia.gov

Project Numbers
State  U000-138-R43,M501, P101, R201
UPC  116867

Locality: City of Winchester/Staunton District

Translation assistance: For translation assistance, please call the VDOT Staunton District Civil Rights Office at 540-292-3040. More information on Translation services can be acccessed here.

Provide Project Feedback

Contact Information

(required) Please provide your zip code.

Are there any specific proposed features of this project that you do or do not favor? What are they? Why?

Cost
0%
Timeline
0%
Safety
0%
Environment
0%
Other
0%
Closed to responses

Do you support this project? Or do you support this project With modifications you list below.

Yes
No
Other
Closed to responses

In compliance with the National Environmental Policy Act (NEPA), VDOT has considered the project's potential impacts to environmental resources, including historic properties, public parks, wetlands and streams. A copy of the NEPA document, including statements regarding the Section 106 process, is available for your review. Please use this space to provide comments on the proposed impacts to environmental resources and/or any other environmental issues or concerns you might have.

Closed for Comments

Were VDOT representatives able to answer your questions? If not, were you offered further assistance?

Yes
0%
No
0%
Other
0%
Closed to responses

How did you hear about this meeting?

Newspaper
0%
Social media
0%
Road sign
0%
Direct mail
0%
Project website
0%
Other
0%