Frederick County – Route 7 (Berryville Pike) Intersection Improvements

Frederick County – Route 7 (Berryville Pike) Intersection Improvements

Survey Closed 

This project is designed to improve safety and traffic flow on Route 7 (Berryville Pike) in Frederick County by addressing increasing traffic volumes on Route 7 and reducing conflict points. This is in the area of Millbrook Drive and First Woods Drive.

Motorist and pedestrian safety can be affected by highway conflict points, such as intersections. Higher traffic volumes can make previously well-functioning intersections experience lengthy delays and crashes. Improvements can be achieved by maximizing existing infrastructure.

Redesigning two Route 7 intersections will create fundamental traffic pattern changes resulting in fewer delays and potentially fewer crashes.

On Route 815 (Blossom Drive) at Route 7, a raised median will be installed at this intersection restricting Route 815 northbound through traffic. Only left and right turns onto Route 7 will be permitted for northbound Route 815 traffic.

On Millbrook Drive at Route 7, a raised median will be installed at this intersection, restricting Millbrook Drive southbound through traffic. Only left and right turns onto Route 7 will be permitted for southbound Millbrook Drive traffic.

As a result of these changes there will be no through traffic between Route 815 and Millbrook Drive crossing Route 7.

Route 815 (Blossom Drive) and Millwood Drive will receive milling and new pavement between Cardinal Lane extending 0.05-mile north of Route 7.

Changes on Route 7 include closing the westbound left-turn lane at Route 815/Millbrook Drive, and closing the Route 7 eastbound left-turn lane near First Woods Drive. The project also provides an additional left-turn lane on Route 7 westbound at First Wood Drive with waiting traffic storage of 355 feet and taper of 200 feet.

These changes will allow shorter signal timing at both intersections and less delay on Route 7.

Benefits
The Route 7 access management projects will potentially reduce future crashes and delay along the Route 7 corridor.

Project Schedule
Project plan approval Late 2023
Right of Way Spring 2024
Construction advertisement Early 2025

Project Costs

Preliminary Engineering $274,643
Right of Way $129,973
Construction $833,714
Estimated total cost $1,238,329

 

Public Outreach

Design Public Hearing
Wednesday, August 2, 2023
4 p.m. to 6 p.m.

Public Comment Deadline - August 12, 2023

Public Meeting Location

Millbrook High School
251 First Woods Drive
Winchester, VA 22603

Design Public Hearing Materials

Coming Soon: Project displays: See Documents & Materials tab below 
 

Resources

Contact Information:
Tracey Bowman
tracey.bowman@VDOT.Virginia.gov 
540-332-9240

Phase: In Design

State Project Numbers
0007-034-944,C501, P101, R201

Federal Project Numbers: STP-0034-8(056)

UPC: 119644

Lat/Long: 39.18819 - 78.11583

Localities: Frederick County / VDOT Staunton District

Translation assistance: For translation assistance, please call the VDOT Staunton District Civil Rights Office at 540-292-3040. More information on Translation services can be acccessed here.

Provide Project Feedback

Do you feel this project will help meet the travel needs of the community?

No
67%
Yes
25%
Comments
17%
Closed to responses | 12 Responses

Are there any specific proposed features of this project (safety, environmental, timeline, etc.) that you do or do not favor? What are they? Why?

Closed for Comments

Were VDOT representatives able to answer your questions? If not, were you offered further assistance?

Yes
50%
Comments
50%
No
0%
Closed to responses | 4 Responses

Are you in favor of this project?

No
80%
With Modifications:
20%
Yes
0%
Closed to responses | 5 Responses

In compliance with the National Environmental Policy Act (NEPA), VDOT has considered the project's potential impacts to environmental resources, including historic properties, public parks, wetlands and streams. A copy of the NEPA document, including statements regarding the Section 106 process, is available for your review. Please use this space to provide comments on the proposed impacts to environmental resources and/or any other environmental issues or concerns you might have.

Closed for Comments